Construction – Investigating the Use of Information Technology in a Construction Project.

Figures, Tables, and Charts etc is a must have

“Project Title: Investigating the Use of Information Technology in a Construction Project.
Aim: To investigate the integration of information technology in a construction project to benefit the transition:
1. from planning to design phase, or
2. from design to execution phase, or
3. from execution to commissioning phase, or
4. commissioning to operations phase.
Students will be allowed to choose one of these four options.“

This order has two parts, Part one: Assignment 5 (speech note+powerpoint). Part two: Report. Those two assignments are linked together. 

They all have very detailed instructions on what you should write. (title and subtitle plus what should be included in this part)

Assignment 5 is a 1200 words Speech note plus Powerpoint.

The other word amount is for assignment task 6.

Speech note is a word file that I can read through while  playing ppt (will have a speech note example, not in this subject, just provide as a form example)